Construction & Demolition Waste Authorisation

  • Home Construction & Demolition Waste Authorisation

Construction & Demolition Waste Authorisation

Construction and demolition (C&D) waste constitutes 30% of India's urban solid waste. Mismanagement leads to air pollution, illegal dumping, drainage blockage, and environmental degradation. The C&D Waste Management Rules, 2016 (amended 2022), mandated by MoEFCC and enforced by CPCB/SPCBs, require authorisation for:

  • Waste generators (>20 TPD)
  • Processing facilities (>5 TPD capacity)
  • ULBs managing collection systems

Neeyal EnviroSolutions provides end-to-end authorisation services ensuring compliance with Rule 7 while promoting resource efficiency through >70% recycling.

Why C&D Waste Authorisation Is Critical

Regulatory Mandate

Required under Section 15 of the Environment (Protection) Act, 1986.

Pollution Prevention

Proper disposal can reduce PM2.5 levels by 45% in construction zones.

Resource Recovery

Enables 90%+ reuse of materials like concrete, bricks, and tiles.

Business Continuity

  • Mandatory for Smart Cities Mission project tenders
  • Provides eligibility for IGBC/LEED green building credits
  • Required for construction/demolition plan approvals

Who Needs Authorisation?

Entity Requirement Threshold
Urban Local Bodies Set up collection sites & processing facilities Mandatory for all ULBs
Processing Plants Facility authorisation Capacity > 5 TPD
Builders/Contractors Waste disposal plan & ULB coordination Generation > 20 TPD
Transporters Registration with ULB All C&D waste carriers

Key Documents Required

  • Form I (Rule 7) with notarised affidavit
  • Land documents: Ownership/lease agreement ≥ 5 years
  • Technology details: Recycling process flowchart (>70% efficiency)
  • Environmental safeguards: Dust suppression systems, noise control
  • Compliance certificates: Valid CTE/CTO
  • New (2023): Real-time waste tracking system for projects >5,000 sqm
  • EPR plan for recycled aggregate products

Authorisation Process

Eligibility Assessment

Site visit and C&D waste audit

Document Preparation

Form I + technical annexures

Online Submission

Through the OCMMS Portal

SPCB Inspection

Facility/process verification

Compliance Resolution

Respond to any queries within 15 days

Authorisation Issuance

Approval within 60 days, valid for 5 years

Validity & Renewal

  • Initial Validity: 5 years (fixed term per 2022 amendment)
  • Renewal Requirements:
    • Annual waste returns submission
    • Recycling efficiency ≥ 70%
    • No environmental compensation penalties
    • Renewal applied 120 days before expiry

Penalties for Non-Compliance

Financial Penalty

Up to ₹50,000/day for illegal dumping (CPCB 2023 guidelines)

Operational Penalty

  • Vehicle seizure for unauthorised transport
  • Blacklisting from tenders for 3 years

Legal Action

  • Prosecution under EPA, 1986
  • NGT cases with ₹5+ lakh compensation

How Neeyal EnviroSolutions Supports You

At Neeyal EnviroSolutions, we streamline your authorisation journey by offering:

Complete documentation and online filing.

Waste audit and facility layout support.

Liaison with ULBs and SPCBs.

Real-time tracking and EPR compliance setup.

👷 Training for site teams and facility managers.

Annual reporting and renewal coordination.